A channel occupation period is preconfigured in a built-in AP, each channel occupation period comprising a first period, and the first period comprising a channel occupation period of the AP.
Starting date of the appropriate transitional period
in point (j) (Transition period), paragraph 3 is replaced by the following
The access point may serve each station in a respective service period within the overall service period.
Transitional period for Articles 57and 60(6
In point (i) (First reference period), the following subparagraph is added
In point (i) (First reference year), the following subparagraph is added
When the built-in AP detects a starting end of the channel occupation period of the AP, a separate channel is occupied in the channel occupation period of the AP to transmit data.
A point is selected based on the digitization time period.
For a subsequent period the temperature set point is set dependent on the energy used in the predetermined period.
This means that you will get from point A to point B in no time!
the end of the validity period provided for in point MED.C.005 of Annex IV.
By way of derogation from point 7.1, within the area and time period referred to therein
By way of derogation from point 8.1, within the area and time period referred to therein
the reference authority may extend the period referred to in point (a) of paragraph 4.
Requêtes fréquentes français :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Requêtes fréquentes anglais :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Traduction Translation Traducción Übersetzung Tradução Traduzione Traducere Vertaling Tłumaczenie Mετάφραση Oversættelse Översättning Käännös Aistriúchán Traduzzjoni Prevajanje Vertimas Tõlge Preklad Fordítás Tulkojumi Превод Překlad Prijevod 翻訳 번역 翻译 Перевод