A sleeper beam (5) as a supporting member of a floor plate (7) of a floor structure body (Fr) in a floor-supporting structure of a building is installed with a gap (D1) provided between the beam (5) and a floor slab (Sf).
A sleeper beam (5) as a supporting member of a floor plate (7) of a floor structure body (Fr) in a floor-supporting structure of a building is installed with a gap (D1) provided between the beam (5) and a floor slab (Sf).
The hopper includes a discharge opening adjacent to the center sill.
The underframe has a center sill (52) and a pair of side sills (54a, 54b).
Stops for limiting compression may be also attached to a center sill.
The center sill (52) disposed between the pair of side sills (54a, 54b) along a generally longitudinally axis of the railcar.
Each discharge door (90a, 90b) may hinge from the center sill (52) for movement between a first position and a second position relative to the discharge openings.
The element includes a recess (10) in its outer surface for casting a concrete stringer (43) and reinforcements (15).
Technologies are described herein for enhancing joint capability and reducing the risk of delaminating a stringer using skew-angle radius fillers.
The stiffener includes at least one of a stringer (18), a frame outer chord (20), and a flange (22, 24, 26, 28) disposed at about an edge of the skin panel.
In use, a resilient joint seal (57) is laid on the edge of the stringer (42) and the edge profile (46) is driven into clipping engagement with the recess (53), entrapping the resilient joint seal (57).
The radius filler also includes a radius contact (304A, 304B) side that has an edge radius (307A, 307B) that is sized to match a radius of a web joint of a stringer.
The end customer will make sure that the support (floor) of the pool enclosure has a concrete stud which is at least 15 cm thick at the level of its running rail.
The end customer will make sure that the support (floor) of the pool enclosure has a concrete stud which is at least 15cm thick at the level of its running rail.
The end customer will make sure that the support (floor) of the pool enclosure has a concrete stud which is at least 15cm thick at the level of its running rail.
The standoff base receives the anchor member, and bears upon the strap.
When the beam (5) receives a downward shock load, the vibration-absorbing device (T) prevents the load from being transmitted to the floor slab and minimizes vertical vibration of the beam.
The strap is connected the first building structural member by means of the fasteners.
Both ends of the beam (5) are arranged with a gap (D2) provided between each end and vertical building-frame walls (2), and the beam (5) is supported by the building-frame walls (2) with elastic bodies in between.
An initial report must also be made if the integrity of a means of containment was compromised or if the centre sill or stub sill of a tank car cracked by at least 15 cm.
A vibration-absorbing device (T) is interposed between the floor slab (Sf) and an intermediate portion of the beam (5).
Fifty-eight tank cars exhibited at least 1 damaged stub sill or coupler.
The lifting yoke can be displaced sideways and turned by means of hydraulic cylinders (20) so as to come in a locking position over a container which is to be lifted.
Forty-six tank cars were damaged at both ends of the car, including damage to the stub sill or coupler.
The curtain wall of the façade is composed of modular prefabricated elements, including sill, fascia and vertical, especially in fiber concrete.
(viii) Underframe/Stub Sill Type (UF/SS DESIGN): The design from Line 32 of AAR Form 4-2.
The end customer will ensure that the support (ground) of the swimming pool enclosure is provided with a stub of concrete of at least 15cm thickness at the level of its track.
Almost every derailed tank car exhibited at least 1 damaged stub sill or coupler, and most were damaged on both ends.
The end customer will ensure that the support (ground) of the swimming pool enclosure is provided with a stub of concrete of at least 15cm thickness at the level of its track.
Requêtes fréquentes français :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Requêtes fréquentes anglais :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Traduction Translation Traducción Übersetzung Tradução Traduzione Traducere Vertaling Tłumaczenie Mετάφραση Oversættelse Översättning Käännös Aistriúchán Traduzzjoni Prevajanje Vertimas Tõlge Preklad Fordítás Tulkojumi Превод Překlad Prijevod 翻訳 번역 翻译 Перевод