The pavement body layer (2) has slits opening to the pavement surface (2a).
The pavement structure (1) comprises mainly a pavement body layer (2) forming a surface layer and a water supply device (3).
The pavement body layer (2) is positioned nearest a ground surface side, and formed, for example, by spreading pavement blocks (20) having water-holding property.
A water supply tape (31) is a water supply means for supplying water to the pavement body layer (2), and buried in each of the joints (25).
The extension is largely carried out on the existing roadway.
The PTS system automatically aligns the W 250i parallel to the road surface.
Afterwards we add a 12 cm thick upper layer, without the addition of geopat or other additives.
The superstructure (2) of a carriageway is embodied in a multi-layer manner and comprises, as the surface and first layer (3), a hardened compound consisting of glass particles, an organic adhesive, and a polyurethane adhesive.
The challenge is to ensure that only the damaged layers of the road structure are removed - and to avoid disruptions to traffic at the same time.
Requêtes fréquentes français :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Requêtes fréquentes anglais :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Traduction Translation Traducción Übersetzung Tradução Traduzione Traducere Vertaling Tłumaczenie Mετάφραση Oversættelse Översättning Käännös Aistriúchán Traduzzjoni Prevajanje Vertimas Tõlge Preklad Fordítás Tulkojumi Превод Překlad Prijevod 翻訳 번역 翻译 Перевод