Ballast pick-up is an open point in HS INF TSI.
In the maintenance plan, established by the HS INS TSI 4.5.1 and also by the future CR INS TSI, the following additional inspection rules have to be taken into account:
safety problems caused by aerodynamic effects of passing trains are not addressed within this TSI (see HS INS TSI)
Ballast pick-up is an open point in HS INF TSI.
Conventional rail infrastructure TSI (CR INF TSI).
TSI Rolling Stock HS: Section 4.2.3.3.2
TSI Rolling Stock HS: section 4.2.7.11
TSI Rolling Stock HS: Section: 4.2.7.4.1.1
Clause in the HS RST TSI
TSI Rolling stock HS: Section: 4.2.20
TSI Rolling Stock HS: Section 4.2.7.9
TSI Rolling Stock HS: Section 4.3.4.8
TSI Rolling Stock HS: Section 4.2.6.6
TSI Rolling Stock HS: Section 4.2.7.10.1
TSI Rolling Stock HS: 4.2.7.12, 4.2.8.3.6.9
Requêtes fréquentes français :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Requêtes fréquentes anglais :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Traduction Translation Traducción Übersetzung Tradução Traduzione Traducere Vertaling Tłumaczenie Mετάφραση Oversættelse Översättning Käännös Aistriúchán Traduzzjoni Prevajanje Vertimas Tõlge Preklad Fordítás Tulkojumi Превод Překlad Prijevod 翻訳 번역 翻译 Перевод