Disclosed is an environment-friendly embankment block.
The invention relates to an enclosure structure (1) including a fill embankment (2) and a roof (3), the roof resting on the fill embankment and being secured thereto.
Evolution of the saturation of a heterogeneous embankment
In this case, the stirrup (3) is generally extended horizontally in the embankment.
Provided is a system for manufacturing embankment material, whereby an embankment material can be efficiently manufactured in a limited space at a final disposal site.
A geotextile-reinforced deep fill embankment section near kilometre 82; and,
The invention relates to a building including a cladding, a backfill at the back of the cladding, synthetic reinforcement strips distributed in the backfill, and a connection system between the reinforcement strips and the backfill.
Each of the pockets may engage the base of loose fill and/or receive the covering of loose fill.
The backfill is preferably placed in a shallow cavity in the concrete surface and the sacrificial anode is inserted into the backfill.
Each tile may be configured for receiving a covering of loose fill.
Said material can be installed as a filler in trenches to intercept the passage of water or as a filer in reservoirs and channels through which a surface water course flows.
tipping of material for bridge ramp
Cemented rockfill is dumped from the top to fill the opening.
The invention relates to a pontoon that is adapted for transporting dump material such as rock boulders and stones.
Dumping is defined as the “depositing of fill in a location other than where it was obtained” and includes moving fill from one location on a property to a different location.
The invention also concerns plants for implementing said method and the resulting filling material.
Landfall at Dunkirk (dredging, backfilling, civil works)
A method of local filling to control surface subsidence in a gob.
Such a dome can be buried under filling material and can be used to roof over a large hall.
50% of the property value, if backfilling was carried out before 1994;
Each tile may be configured for disposing on a base of loose fill.
The front side (36) of the wafer is then coated (24) with an underfill material (40).
It must be constructed on stable and compacted fill.
Engaging employees to reduce our general (land-fill) waste
Earthworks (remblai): In military architecture, a defensive structure constructed of earth.
Here Solomon built the Temple that David had wanted to build.
( remblai) in military architecture, a defensive structure constructed of earth.
The English Embankment in St. Petersburg: History and Today
Next, a first tier of the face panels is disposed at the bottom of the embankment being erected.
Foreshortening and shadows made for an strange rendering.
The canal in its trees section, on the imposing embankment.
After a relatively brief cure period, the landfill is ripped and the material is crushed and graded.
On our left is the St. Petersburg hotel, Pirogovskaya Emb., 5/2.
The embankment promenade was inaugurated on 6th August 1950.
Thus, any draw off of retaining wall blocks is prevented by means of the fiber belts buried in the embankment.
Requêtes fréquentes français :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Requêtes fréquentes anglais :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Traduction Translation Traducción Übersetzung Tradução Traduzione Traducere Vertaling Tłumaczenie Mετάφραση Oversættelse Översättning Käännös Aistriúchán Traduzzjoni Prevajanje Vertimas Tõlge Preklad Fordítás Tulkojumi Превод Překlad Prijevod 翻訳 번역 翻译 Перевод