(Here comes the silly question)...Do I have to nail all the floorboards?
Depth of water over dock sill (high water ordinary spring tide) 12.19
The invention comprises a transversely-extending mould which is used to form the concrete sill.
floor of the gate chamber
concrete floor to economising basin
floor of dry dock and foundation of machinery house on a general base of lean concrete
mass concrete floor of lock chamber
depressed floor of gate chamber
You do need to keep track of your expenses that you are going to write off.
After that, the only instance of the built decided to write off.
The venture failed and ALC had to write off the entire amount.
[67] In 1986, DC decided to write off the JSA from active continuity.
In 1986, DC decided to write off the JSA from active continuity.
The tank has inlet (20) and outlet (22) inverts for wastewater.
The sensor is calibrated to provide output signals related to the velocity of the slurry at the invert.
The invert needed to be redone and Stephane Dumonceaux arrived with this new solution .
composed of a vault, 2 sidewalls with or without external soles and possibly an invert.
The required indication of slurry flow conditions prevailing at the invert is then obtained by monitoring the level of power supplied to the heater.
timber apron for scour protection
The bond provides a fluid impermeable joint between the apron (4) and the fluid barrier sheet (2).
In this case, it is incorporated under the apron or the building’s foundations.
In this case, it is incorporated under the apron or the foundations of the building.
In this case, it is incorporated under the apron or the building’s foundations.
Slab’s instrumentation was installed during summer 2016, and allowed to verify the good behavior of the concrete during its pouring in October 2016.
Some 4,000 tonnes of iron rebar will be part of the Tokamak Complex slab.
By December 2013, the B2 slab—or Tokamak Complex basemat—will be in place.
When the B2 basemat slab is completed in 2014 the Tokamak Complex will begin to rise.
Reinforcement of the base-slab for a reservoir on the petrochemical site (Portes-les-Valence) with approximately 100 tons of steel rebar.
In arrangements, the flow space may be formed in a plug member associated with the housing.
to remove the case from the register
to delete a name from the register of electors
to cancel the mark from the register
information on an IF to be deleted
extra-high egg shaped concrete sewer
The seat portion structure includes a base plate (12).
if_req_del: information on an IF to be deleted
The mattress foundation can be made of two mattress foundation members that are spaced apart by spacer members. the mattress foundation members can be oriented with respect to each other so as to provide a combined height that is adjustable.
A height-adjustable mattress assembly is constructed of a mattress foundation and an optional frame assembly with a plurality of ground support members supporting the mattress foundation.
baffle type water seal
Accordingly, it is appropriate to delete those substances from the register.
The interested party urged for the withdrawal of these companies from the undertaking.
The raft (12) is dragged over the top of the plants and the means for applying the substance (14) mounted to the raft (12) applies the substance onto said plants.
specifies that information on an existing MFI to be deleted is given
mfi_req_del: specifies that information on an existing MFI to be deleted is given
Requêtes fréquentes français :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Requêtes fréquentes anglais :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Traduction Translation Traducción Übersetzung Tradução Traduzione Traducere Vertaling Tłumaczenie Mετάφραση Oversættelse Översättning Käännös Aistriúchán Traduzzjoni Prevajanje Vertimas Tõlge Preklad Fordítás Tulkojumi Превод Překlad Prijevod 翻訳 번역 翻译 Перевод