Requirements for track stiffness as a complete system are an open point.
The detailed specification of the interface between the Rolling Stock vigilance device and the GSM-R onboard assembly remains an open point.
Requirements for track stiffness as a complete system are an open point.
As requirements for track stiffness are an open point, no assessment by a Notified Body is needed.
Requirements for track stiffness as a complete system are an open point.
Thus again the sole remaining issue arose under Article 8.
keep drink from him and him from drink, or we cannot answer for the
keep drink from him and him from drink, or we cannot answer for the
I consider that it would be prudent to leave this point open to be decided in a later case.
issue pending’ when the evidence provided by the applicant is not satisfactory and additional information is still required;
Issue pending’ if the evidence provided by the applicant is not satisfactory and additional information is still required;
Requêtes fréquentes français :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Requêtes fréquentes anglais :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Traduction Translation Traducción Übersetzung Tradução Traduzione Traducere Vertaling Tłumaczenie Mετάφραση Oversættelse Översättning Käännös Aistriúchán Traduzzjoni Prevajanje Vertimas Tõlge Preklad Fordítás Tulkojumi Превод Překlad Prijevod 翻訳 번역 翻译 Перевод