Updating the Feasibility study and Detailed engineering design for upgrading of 250 km of road and detailed design of Masindi port bridge.
In June 2009, the preliminary and final draft design studies were submitted.
Updating the feasibility study and detailed engineering design for upgrading of the Rwenkunye-Apac-Lira-Acholibur (250 km) and detailed design of Masindi Port Bridge
Having finished with the Plan and the initial planning process, now we will focus on the next planning phase which will include:
The interior designer, within the framework of a project management contract of design and realization, realizes the DFD (Definitive Final Draft) allowing to adjust the project in its technical design and its cost.
Liaison members wanting to contribute in a Working group for the development of successive working drafts resulting in a Committee Draft should contact the SC10 secretariat.
Full Development (FD) The procedure containing all of the engineering processes, trials and tests necessary to establish the final detailed design to enable full production to commence.
Requêtes fréquentes français :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Requêtes fréquentes anglais :1-200, -1k, -2k, -3k, -4k, -5k, -7k, -10k, -20k, -40k, -100k, -200k, -500k, -1000k,
Traduction Translation Traducción Übersetzung Tradução Traduzione Traducere Vertaling Tłumaczenie Mετάφραση Oversættelse Översättning Käännös Aistriúchán Traduzzjoni Prevajanje Vertimas Tõlge Preklad Fordítás Tulkojumi Превод Překlad Prijevod 翻訳 번역 翻译 Перевод